Manufacturing BI Consulting
We connect ERP, MES and shop-floor data so plant managers can see OEE, scrap and throughput per line and shift, while there is still time to act.
Most manufacturers already record what happens on the shop floor. The data sits in systems that do not share codes, reaches managers days later, and is often not trusted by the people who should use it.
SAP, Oracle and MES systems hold the data, but reports are built by hand and separately for each plant, so comparing sites is slow.
Availability, performance and quality losses are tallied in spreadsheets days later, long after the shift that caused them has finished.
ISO standards, traceability and audits require complete production records, yet many plants still rely on paper and on quality systems that are not connected to production data.
From ERP integration to shop-floor dashboards, we build manufacturing BI on top of the systems you already run.
Illustrative scenarios and sample figures showing a possible approach. These are not verified client results or a promise of savings.
Automotive Parts Manufacturer
Example scenario: connect plant records to a Power BI environment for shift-level OEE review. The sample defect reduction is an illustrative target; validate the baseline and interventions in a pilot.
Food & Beverage Plant
Example scenario: bring ERP lots, lab results and warehouse movements into a traceability search. Sample investigation times illustrate an objective; quality managers must verify completeness and audit readiness.
Industrial Equipment Maker
Example scenario: consolidate plant data in Azure Synapse and Power BI for consistent reporting. The sample close-time reduction is an illustrative target, subject to reconciliation rules and a measured baseline.
We work with the platforms your teams already use and add newer data tools only where they solve a real problem.
Sample objectives for discussion. Establish a baseline and measure actual pilot outcomes.
22%
Sample defect reduction target
35%
Sample reporting-time reduction
4 hrs
Sample investigation-time target
Case study
Client names are changed for confidentiality. Results are measured against each client's pre-project baseline.
Case study. Client names are changed for confidentiality. Results are measured against each client's pre-project baseline.
ProductApply condition signals and maintenance workflows to critical machines, cells, and production lines.
Case studyDynamic stock policies and supplier-risk signals transfer directly to components and raw materials.
Case studySensor baselines, anomaly scoring, and ranked alerts apply across rotating and production equipment.
Whether you start with one plant or several, we begin with the data you have and one clear question, and scope a first dashboard you can judge before going further.